Skip to main content

Construction Scheduler - Mobile Construction

SpaceXManagementPhysical Infra
Work mode
On-site
Full Time
Location
Experience
4+ yrs

Memphis, TN at a glance

Rent
#30 of 51
1-bedroom-19% vs US avg
Weather
#33 of 51
150 mild days115 hot · 0 cold
Income tax
#51 of 51
NoneTennessee

What you need

  • 4+ yrs construction scheduling on active projects
  • 4+ yrs using Smartsheet, MS Project, or similar tools
  • 4+ yrs with DCMA 14-point or USACE specification-driven schedules
  • Willing to relocate and work fully onsite at mobile sites
  • U.S. citizen, permanent resident, refugee, or asylee required

What you'll do

  • Build and maintain baseline CPM construction schedules
  • Produce weekly look-aheads and monthly schedule updates
  • Analyze schedule impacts and prepare time-impact analyses
  • Coordinate with PMs, superintendents, and subcontractors on committed dates
  • Visit sites regularly and relocate with mobile construction team

SpaceX was founded under the belief that a future where humanity is out exploring the stars is fundamentally more exciting than one where we are not. Today SpaceX is actively developing the technologies to make this possible, with the ultimate goal of enabling human life on Mars.

SpaceXSI is building Super Intelligence to help humanity understand the universe. Our teams are building the full Super Intelligence stack: from our Colossus supercomputers, to Grok models, to our suite of applications, including Grok Bot, Grok Build, Grok Imagine, Grok Voice, and X. We're creating a powerful flywheel where more compute trains better models, better models power more useful products, and what we learn from people using those products shapes what we build next.

CONSTRUCTION SCHEDULER

Develop, maintain, and communicate construction schedules that the field, subcontractors, and leadership can actually use. You will build CPM baselines, update them from real progress, flag risk early, and explain schedule impact of changes, delays, and recovery plans. This is not a data-entry role. You need enough means-and-methods knowledge to challenge a sequence that will not work in the field.

Superintendents run the work; project managers own cost and contracts; the scheduler is the person who can tell you what is actually driving the end date, what slips if a trade is late, and whether a recovery plan is real.

The team goes where the next site is — a pad, a factory, a supercluster, whatever has to exist before the rest of the company can move. Right now that is Memphis, TN / Southaven, MS. Then it is the next one. Per diem comes with the assignment.

RESPONSIBILITIES:

  • Build baseline CPM schedules from drawings, specs, estimates, bid packages, and construction sequences (WBS, activity coding, logic, calendars, and constraints used sparingly and correctly)
  • Maintain the live schedule: collect progress from superintendents, project managers, and trades; update percent complete, remaining duration, and logic; publish a clean current-period update on a set cadence (typically weekly look-aheads and monthly official updates)
  • Own the critical path. Identify near-critical work, float erosion, and out-of-sequence progress. Tell the team why the end date moved, not just that it did
  • Produce three-week (or similar) look-aheads that match the master schedule and what the field can actually crew
  • Analyze schedule impact of RFIs, change orders, design late-outs, access constraints, long-lead procurement, weather, and labor shortages. Prepare time-impact analyses (TIA) and what-if, recovery, and acceleration scenarios
  • Coordinate with project managers, superintendents, estimators, procurement, design, owners/CMs, and subcontractors so the schedule reflects committed dates, not wishful ones
  • Resource-load and, where required, cost-load the schedule. Flag crew stacking, craft shortages, and unrealistic production rates
  • Prepare narratives, variance reports, S-curves, histograms, and executive summaries for internal reviews and owner/CM submittals
  • Support claims and delay documentation with contemporaneous records (as-planned vs. as-built, fragnets, delay categorization) when needed
  • Enforce schedule standards: naming, coding, update process, backup, and version control so the file remains auditable
  • Facilitate or support pull-planning / Last Planner sessions and convert those commitments into logic in the CPM model
  • Visit the site regularly. A scheduler who never walks the job will be wrong
  • Relocate with the mobile team as assignments change, starting in Memphis, TN / Southaven, MS

BASIC QUALIFICATIONS:

  • 4+ years of construction scheduling on active projects (GC, CM, owner’s project controls, or specialty contractor)
  • 4+ years of experience using Smartsheet, MS Project, or other project management tool
  • 4+ years of experience with owner/CM specification-driven schedules (e.g., DCMA 14-point, USACE, or similar quality metrics)

PREFERRED SKILLS AND EXPERIENCE:

  • Comfortability with multiple calendars, relationship types, filters, layouts, global vs. project data, and schedule quality checks (open ends, negative float, SS/FF overuse, constraints)
  • Bachelor’s in construction management, civil engineering, or a related field; OR equivalent field experience
  • PSP (AACE), PMI-SP, PMP, CCM, or similar credential
  • Experience with owner/CM specification-driven schedules (e.g., DCMA 14-point, USACE, or similar quality metrics)
  • Forensic delay analysis, time-impact analysis, and claims support
  • Cost/resource loading, earned value, and integration with cost systems
  • Last Planner / pull planning; BIM 4D (Navisworks, Synchro) is a plus
  • Additional tools as applicable: Power BI, Smartsheet, Procore, Autodesk Construction Cloud

ADDITIONAL REQUIREMENTS:

  • Willing to work extended hours as needed, including the current 6-day / 12-hour construction cadence
  • This role is part of the mobile construction team and you will be expected to travel to the assigned work project. Current work assignment is based in Memphis, TN / Southaven, MS. Future assignments will require relocation to other U.S. construction sites. Per diem is provided while on assignment
  • Must be comfortable working in a fully onsite environment
  • Must be willing to work any shift, extended hours and/or holidays during assigned work assignment. This includes rotating shifts, nights and/or weekends. If you are assigned night shift, you will receive a shift differential for hours worked during off nominal hours
  • Must be willing to work in industrial environments with exposure to noise, heavy equipment, excavations, and energized electrical systems. Must be able to lift 25 lbs+ unassisted and perform physically demanding tasks outdoors/indoors, tight conditions and/or at heights

ITAR REQUIREMENTS:

  • To conform to U.S. Government export regulations, applicant must be a (i) U.S. citizen or national, (ii) U.S. lawful, permanent resident (aka green card holder), (iii) Refugee under 8 U.S.C. § 1157, or (iv) Asylee under 8 U.S.C. § 1158, or be eligible to obtain the required authorizations from the U.S. Department of State. Learn more about the ITAR here.  

SpaceX is an Equal Opportunity Employer; employment with SpaceX is governed on the basis of merit, competence and qualifications and will not be influenced in any manner by race, color, religion, gender, national origin/ethnicity, veteran status, disability status, age, sexual orientation, gender identity, marital status, mental or physical disability or any other legally protected status.

Applicants wishing to view a copy of SpaceX’s Affirmative Action Plan for veterans and individuals with disabilities, or applicants requiring reasonable accommodation to the application/interview process should reach out to [email protected]. 

Optimize your resume for this job

Get a match score and the keywords you're missing

Optimize resume

About SpaceX

SpaceX designs, manufactures, and launches rockets and spacecraft, operates the Starlink satellite internet constellation, and provides crew and cargo transport to the International Space Station.

Get new SpaceX jobs by email

One email a day at most, and only when SpaceX posts a new role. You confirm by email first.

Every alert has an unsubscribe link. Privacy

Similar roles

Construction Scheduler - Mobile Construction
SpaceX
Apply